Name of Project: SpringHill Suites by Marriott San Diego Downtown/ Bayfront
Project Address: 900 Bayfront Court San Diego CA 92101 (guest access only)
Approx. Size: 3000 square feet
Original Surface: Existing Concrete W/ Coating
Existing Coating: Multiple existing coatings – Existing Urethane Coating covered with cementious overlay
Pool Deck needed resurfacing.
This hotel pool deck was in need of resurfacing as the existing coating system was chipping and peeling coating. Life Deck was called in to provide a solution. We knew that the existing coating needed to be removed prior to the installation of a new one. Since the pool deck was on the fifth floor a waterproofing system was needed. Westcoat’s MACoat standard system was the right fit for the project.
Our Process for Creating a New Surface
System Installed: MACoat Standard System
Color(s): Cape Cod Gray and Stone Gray alternating pattern
Pattern: Multiple colors used to match existing coating.
Texture: TC-3 Knockdown Texture
Top/Coat Sealer: SC-10 Acrylic Topcoat and SC-42 WB Sealer
The Final Touches
After to existing coating was removed, a 100% solids epoxy primer was applied with a sand broadcast to refusal for maximum adhesion. The MACoat fiberlath reinforced system was installed per specification on top of the primer. The final texture was a knockdown finished with multiple colors of SC-10 Acrylic Topcoat to match the existing coating throughout the property. New depth markers and no diving markers were installed per current county standards. Fun and successful project!