Holiday Inn Bayside

Project Description

Hotel maintenance is a year-round responsibility, especially here in sunny San Diego! The Holiday Inn Bayside is within a 5-minute drive of Shelter Island and Marine Corps Recruit Depot. The hotel’s bar patio and pool deck are over 6,000 square feet and it was pivotal to get them up to date.

The Challenge

The old coating had met its life expectancy and was beginning to delaminate from the concrete substrate. It was also old and weathered and needed to be aesthetically upgraded.

Due to having over 6,000 square feet of concrete to resurface it was a timely job to complete.

The Solution

The old coating was completely removed down to a bare concrete substrate. Westcoat’s EC-12 100% solids epoxy primer was applied with a sand broadcast to refusal for maximum adhesion. Multiple slurry coats of Westcoat’s TC-1 cement were applied followed by the application of Westcoat’s TC-3 cement in a knockdown texture.

To finish the look, two coats of Westcoat’s SC-10 in Rocky Nook and one coat of Westcoat’s SC-42 clear sealer were applied. The final touch was applying joint sealant to all expansion joints.